Perspective · 2023
Research articlePublished Jun 2013
AVAILABLE TRANSFER CAPABILITY CALCULATION USING DCPTDF INCORPORATING MULTIPLE LINE CONTINGENCIES and GENERATOR ADDITION UNDER DEREGUALTED ENVIRONMENT
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
Before deregulation there was only single entity to generate and distribute electricity in an area. Due to this monopoly, the price of electricity was on the higher side and also the quality of electricity was not satisfactory. This scenario changes after the deregulation of power industry. The competition arises in generation and distribution. But the transmission corridor remains the same for transferring the power. Every operator wants to maximize their profit. Due to this the number of transactions increases. This may cause congestion in transmission network. To avoid congestion, every operator should know the value of ATC before every transaction. In this paper the ATC is calculated using DCPTDF scheme. The multiple line contingencies and an extra generator addition are considered and their effect on the value of ATC is shown. The above said methodology is applied on IEEE 30-bus test system.
Keywords
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
More from this journal
The newest in International Journal of Advanced Research in Electrical, Electronics and Instrumentation Engineering.
Conferences in this field
Upcoming conferences in this field.
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalInternational Journal of Advanced Research in Electrical, Electronics and Instrumentation Engineering
- SubjectEngineering
- BylineArticles whose byline prints “Naresh K. Yadav”
- BylineArticles whose byline prints “Prashant Sharma”
