Root Delay Causes for Construction Projects
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
Many research works were conducted worldwide to measure the sources of construction project delays. Most of these research works dealt with the actual delays or the occurred delays that actually recorded or noticed on completed or in-progress construction projects but there is limited research was conducted to search for the root of delay causes in construction projects. The presented research in this paper aims at extracting the root delay causes of construction projects. Design/methodology/approach: Fifty-three delay causes were gathered from previous research work conducted globally, then using cause-effect analysis to extract root delay causes. The resulted root delay causes were verified using a field interview questionnaire with thirty experts in the construction industry. Statistical analysis contains descriptive, factor analysis and check of independency to check the legitimacy of the resulted root delay causes. Findings: Fourteen root delay causes were resulted from cause-effect technique analysis. These root delay causes include project parties’ management efficiency, inter-relationship work environment and specific project characteristic. Originality/value: Although construction delays have been globally investigated in previous studies relating to construction management, few have attempted to analyze and search for the root delay causes. The existing research is aiming to analyze in deep the recorded delays and attempting to get their root causes. These root delay causes are the underpinning of project delay, so prior evaluation of these root delay causes before project starts can predict the prone of project to delay. The evaluation of these root delay causes can help project planners to put in their mined the possibility of project delays and the areas to be focused to mitigate the effect of proposed delays in case of occurrence. This step can be used a step of project risk analysis to enhance the delay management mitigation strategy.
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
Similar by topic
Research article · 30 Oct 2023
Detection of Construction Delays on Selected Residential Projects Located Near and Within Metro Manila During Actual Project Execution Using Contemporaneous Method of Measurement
Research article · 20 Sep 2022
Pandemic Construction Delay and Cost Overrun Analysis in Water Resource Project
Research article · 17 Aug 2022
Detail Study of Delay Analysis in Construction Projects due to Multiple Factors Using RII Method
Conference abstract · 16 Nov 2015
Estimating project over-runs due to common construction delays using daily productivity impact index
More from this journal
The newest in International Journal of Innovative Research in Science, Engineering and Technology.
Review article · 2018
Tech-Care: Personal Health Monitoring and Prediction System
Research article · 2018
Spectrum Sensing Methods for Cognitive Radio: A Survey
Review article · 2018
Utilization of Food Wastes to Prepare Film Forming Biomolecules (Retracted)
Conferences in this field
Upcoming conferences in this field.
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalInternational Journal of Innovative Research in Science, Engineering and Technology
- SubjectEngineering
- BylineArticles whose byline prints “Iehab Soliman Moursi”