STUDY ON APPLICATION OF GENETIC ALGORITHM IN CONSTRUCTION RESOURCE LEVELLING
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
Resource management ensures that a project is to be completed on time, at cost, and its quality is as previously defined; nevertheless, the scarcity of resources is a usual reason for project delays. Traditional analytical and heuristic approaches are inefficient and inflexible when solving construction resource levelling problems. The proposed algorithm can effectively provide the optimal or near-optimal combination of construction resources by the starting and finishing dates of activities subjected to the objective of resource levelling. In the proposed method the activity to be selected first for shifting is based on the largest value of resource rate. The process is repeated for all the remaining activities for possible shifting of resources by searching the fittest solution by the Genetic Algorithm. The GA procedure searches for optimum results in set of tasks and priorities that produce shorter project duration and better using MS Excel Evolver software
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
More from this journal
The newest in International Journal of Innovative Research in Science, Engineering and Technology.
Research article · 2018
Spectrum Sensing Methods for Cognitive Radio: A Survey
Review article · 2018
Utilization of Food Wastes to Prepare Film Forming Biomolecules (Retracted)
Conferences in this field
Upcoming conferences in this field.
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalInternational Journal of Innovative Research in Science, Engineering and Technology
- SubjectEngineering
- BylineArticles whose byline prints “N.Satheesh Kumar”
- BylineArticles whose byline prints “R.Raj Kumar”