Scholars Central

Research articlePublished 6 Aug 2021

Capacity of Interchange in Outer Connection Ramps

Authors: Jihad Obeidat

Journal of Applied Mechanical Engineering

Volume 10 · Issue 9 · Pages 1–7

Ask about this article

Abstract

Select any words in the title or abstract, or press this and choose a sentence.

Interchanges are constructed in urban and suburban areas to ease traffic operation. Outer connection ramps constitute a major part of interchanges planning and design. The objective of this study was to estimate interchange ramp capacity and investigate the impacts of ramp geometry on the obtained capacity. To achieve this objective, 20 ramps were selected, including 10 circular ramps and 10 curve- straight-curve ramps. Capacity of ramp proper and ramp exit were investigated in the study. At ramp proper, data on traffic speed and traffic flow were collected at 1-minute intervals using video camera. Also, traffic data for ramp exit and mainline traffic were obtained under queued traffic condition on the ramp exit. An empirical approach using regression analysis was adopted to estimate capacity of the selected ramps and explore the impact of geometric design and traffic variables that might affect the estimated capacity. For ramp proper, the analyses revealed that the relationship between traffic speed and density is linear and between speed and traffic flow is parabolic irrespective of ramp configuration. For circular ramps, the capacity was found to vary from 1470 to about 2100 pc/hr./lane, and it was found that ramp radius is the most influencing factor in capacity estimation. For curve-straight-curve ramps, the results indicated that the obtained capacity varied from 1490 to 2200 pc/hr./lane, and both the straight segment length and the radius of the first curve are the most influencing factors. Also, it was found that ramp exit capacity is affected by flow and speed of traffic in the mainline street and degree of curvature of ramp exit curve. Finally, it was concluded that the use of curves with large radii at ramp proper and exit would increase ramp capacity, and customization of capacity values to reflect local conditions would provide more realistic estimates.

Subjects

Engineering

Ask about this article

Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.

Try:

More from this journal

The newest in Journal of Applied Mechanical Engineering.

All its articles

Conferences in this field

Upcoming conferences in this field.

Follow

New articles from what you follow go into your email digest, once you agree to alert emails.

  • JournalJournal of Applied Mechanical Engineering
  • SubjectEngineering
  • BylineArticles whose byline prints “Jihad Obeidat”

For authors and organisers

Publish, present and keep up with your field

Find the right journal for your paper and submit your manuscript.

Photo: Pexels