Scholars Central

Case reportPublished 2 Feb 2017

Lobo System Scaffold

Authors: ROBERT BOKROS

Oil & Gas Research

Volume 3 · Issue 1 · Pages 1–3

Ask about this article

Abstract

Select any words in the title or abstract, or press this and choose a sentence.

Further to our visit to LOBO’s premises to witness demonstrations of the systems being erected. A site visit by LOBO to Bacton Gas plant to demonstrate the system was carried out on Wednesday, 28/09/2016. LOBO was provided with five different scenarios to which they provided detailed drawings in preparation to erect on site. A site visit was arranged and LOBO attended site to demonstrate erecting and dismantling the system. This report details the type of scenario where LOBO can be used and provides advantages/disadvantages of the system. This report goes into detail on erect and dismantles times where major cost savings can be gained. The LOBO system also has the added benefits that it doesn’t need to be erected by trained scaffolders. Training can be carried for any individual to be competent to erect and dismantle.

Ask about this article

Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.

Try:

Similar by topic

More from this journal

The newest in Oil & Gas Research.

All its articles

Conferences in this field

Upcoming conferences in this field.

Follow

New articles from what you follow go into your email digest, once you agree to alert emails.

  • JournalOil & Gas Research
  • SubjectPetroleum & Mining
  • BylineArticles whose byline prints “ROBERT BOKROS”

For authors and organisers

Publish, present and keep up with your field

Find the right journal for your paper and submit your manuscript.

Photo: Pexels