Waste Data Processing Algorithm in Singular Construction Activities: A Case Involving Implementation of NAVFAC P-405
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
Innovations in construction ‘time waste’ management are scarce. Construction delays are usually caused by time wastes at activity levels, and scholarly studies primarily don't deal in explaining waste at singular activity levels. Experience based heuristics play the most important role in fixing the duration of activities by managers. But, construction activities are prone to highly improbable and complex process flows, making heuristics unreliable. This happens due because the probabilities of construction uncertainties in one project being similar in forthcoming projects are meagerly low. Thus, the experience gained by the project management personnel over the years, may not be handy at predicting actual durations and costs of the forthcoming project with sufficient accuracy.The only practical solution would be a fixation of cost and time standards for singular construction activities based on the complete history of projects completed and those personnel involved in it. In a nutshell, it would mean globalizing or at least nationalizing heuristic data of delays and wastes in order to facilitate meaningful future predictions.This can be achieved by devising a mechanism of centralization of construction process related data into a single entity at the national/international level - Data Collection System (DCS). As part of this system, synchronization of personnel and construction site data should take place at every instance a new construction process is activated anywhere within the boundary of existing DCS. A collection of inventory data, material data, labor data, stakeholder data, activity delay data, time waste data, etc. should form the core data in this data center. Data obtained from heuristics should then be converted to mathematical distributions that could then be used for predictions in future construction scenarios. This would result in giving better and better results as the process of data entry proceeds. The scope of this study is limited to construction activities from Indian construction sites involving core and shell in buildings. “Cost overrun” in:(1) Beam and slab construction,(2) Column construction and,(3) Block work is mathematically modeled as probability distributions.US naval code NAVFAC P-405 is employed for site independent duration calculation. As part of this study, steps on using NAVFAC – 405 in calculating delays are explored in detail. Beta, Normal, and extreme value distributions were seen to fit cost overruns in these activities. This could then be entered into the DCS.
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
Similar by topic
Research article · Feb 2014
An Adaptive Algorithm for Distributed Processing in Multidimensional Data Sets
Research article · Jan 2015
Implementing Multiprime RSA Algorithm to Enhance the Data Security in Cloud Computing
Research article · Feb 2014
Implementation of Mining Algorithms for Improving Efficiencies in Product Session Data
Case report · 5 Feb 2020
Root Cause Analysis of Construction Oil and Gas Project Delays from Engineering and Construction Management Point of View Using Analytic Hierarchy Process (AHP): A Case Study for National Iranian Oil Company Projects
More from this journal
The newest in Journal of Architectural Engineering Technology.
Research article · 29 Jan 2026
Uncovering the Drivers of Violence Against Women and Girls in Brazilian Higher Education: A Partial Least Squares Structural Equation Modelling Approach
Research article · 29 Jan 2026
Sustaining Empowerment: A Comparative Study of Barriers to Women’s Professional Advancement in Pakistan and Brazil
Editorial · 1 Dec 2025
Fire Resistance: Materials, Methods, Structures Research
Conferences in this field
Upcoming conferences in this field.
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalJournal of Architectural Engineering Technology
- SubjectEngineering
- BylineArticles whose byline prints “Safeer Ali Abbas Ali”
- BylineArticles whose byline prints “Krishnamurthy K”
- BylineArticles whose byline prints “Arun C”
- BylineArticles whose byline prints “Ladheedha Nasrin KA”
- BylineArticles whose byline prints “Simy James”
- BylineArticles whose byline prints “Neethu Susan Mathew”
- BylineArticles whose byline prints “Sujatha A”
- BylineArticles whose byline prints “Sumayya PM”