Scholars Central

Review articlePublished 26 Jan 2013

Cable Shovel Stress & Fatigue Failure Modeling - Causes and Solution Strategies Review

Authors: Muhammad Azeem Raza, Samuel Frimpong

Ask about this article

Abstract

Select any words in the title or abstract, or press this and choose a sentence.

Cable shovel is a primary excavation unit in many surface mines around the world. The capacities of the shovels have seen an ever increasing trend to achieve the economies of large scale operation. The modern day shovels have 100+ tons per pass production capacities. The dynamic force of 100+ ton material combined with the dynamic cutting, friction and acceleration forces during the excavation result in severe stress loading of the shovel front end components. Stress and fatigue cracks appear, as a result of this cyclic stress loading, resulting in expansive breakdown of shovel components. Numerical and analytical techniques can be used to model the stress and fatigue failures. This paper outlines the causes and some of the strategies to model stress and fatigue failure of shovel components and to predict shovel component life.

Ask about this article

Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.

Try:

Similar by topic

More from this journal

The newest in Journal of Powder Metallurgy & Mining.

All its articles

Conferences in this field

Upcoming conferences in this field.

Follow

New articles from what you follow go into your email digest, once you agree to alert emails.

  • JournalJournal of Powder Metallurgy & Mining
  • SubjectMaterials Science
  • BylineArticles whose byline prints “Muhammad Azeem Raza”
  • BylineArticles whose byline prints “Samuel Frimpong”

For authors and organisers

Publish, present and keep up with your field

Find the right journal for your paper and submit your manuscript.

Photo: Pexels