A Preliminary Estimate of the Reserve of the Marble Deposit in Itobe Area, Central Nigeria

Onimisi M, Abaa SI, Obaje N

Abstract

A preliminary estimate of the reserve of the marble deposit in Itobe area, central Nigeria was determined from both outcrop geological mapping and geophysical resistivity surveying. Two outcrops (designated as mass I and mass II) of the marble deposit occurring about 850 m apart along a NE–SW axis were identified. The areal extent, thickness and density of the marble have been used in computing the reserve of the marble deposit. The reserve of mass I is estimated at 1418.4 tons and that of mass II has been estimated at 142643.2 tons. The total reserve of the marble deposit is 144061.6 tons.

Relevant Publications in Journal of Geology & Geophysics