Research articlePublished 30 Aug 2020
Evaluation of Small Hydropower plant at Ribb Irrigation Dam in Amhara regional state, Ethiopia
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
Energy is the main requirement for economic growth in any country and also supports the modern economy. The energy sector is considered a vital element in developing countries because it meets energy needs. This article deals with the production of electricity using small hydroelectric power plants for rural applications. The main objective of this study was to assess the potential of the Ribb dam for small hydroelectric plants. Since the height of a proposed site is constant while the available flow is very variable, the flow is very important for the production of hydroelectricity. The flow duration curve is constant from 20% to 50% of the nominal flow, and then decreases as the percentage of the nominal flow increases. The Ribb dam concluded that the average flow of 14.6331m3/s, the smooth head of 70.37 m, and the average nominal power of 5.53 MW would be the most optimal size of a small hydroelectric plant producing a maximum of electricity in the context of future projected flows in the study region. SHP is a promising alternative for the production of cheap and renewable energy in rural or developing areas.
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
Conferences in this field
Upcoming conferences in this field.
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalEuropean Journal of Applied Engineering and Scientific Research
- SubjectEngineering
- BylineArticles whose byline prints “Addisu Worku Bezabih”