Review article · 2018
Research articlePublished Dec 2013
Priority Indexing of Factors Affecting Cost Overruns using AHP Technique
Abstract
Select any words in the title or abstract, or press this and choose a sentence.
This research work has been aimed to find out the causes that are causing cost overruns in the construction projects. This research activity was entirely assessed through questionnaire survey. Various literatures have been reviewed for assessment and evaluation of factors that are causing cost overruns in construction projects. The respondents were selected from various construction occupancy mainly architects, builders, contractors, structural engineers and various consultancy firms. The results accomplished from survey revealed that the major causes of delays and cost overruns during construction projects are the escalation of the materials prices and discontinuity of funds. The overall ranking analysis are indicating that Technical Drawings, Government Policies, Increase in Expenses, Festivals, Investigation or Tests and Specifications are most critical factors, that are responsible for construction cost overruns in South Gujarat specially in Tapi and Surat District
Keywords
Subjects
EngineeringAsk about this article
Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.
More from this journal
The newest in International Journal of Innovative Research in Science, Engineering and Technology.
Research article · 2018
Spectrum Sensing Methods for Cognitive Radio: A Survey
Review article · 2018
Utilization of Food Wastes to Prepare Film Forming Biomolecules (Retracted)
Follow
New articles from what you follow go into your email digest, once you agree to alert emails.
- JournalInternational Journal of Innovative Research in Science, Engineering and Technology
- SubjectEngineering
- BylineArticles whose byline prints “Hiral H. Patel”
- BylineArticles whose byline prints “Chirag J. Shah”
- BylineArticles whose byline prints “Rushabh A. Shah”
- BylineArticles whose byline prints “Urvesh N. Barot”