Scholars Central

Conference abstractPublished 25 Apr 2019

Empowering newly-hired nurses through the medicine program orientation workshop: A quality improvement project (MPOW)

Authors: Nick Anthony Millar, Mena Billeci, Mark Coupland, Stuart Paavola

McMaster University, Canada

Ask about this article

Abstract

Select any words in the title or abstract, or press this and choose a sentence.

Background: A well-designed on-boarding process for newly-hired nurses (NHN) in acute medicine units promotes patient safety and staff job satisfaction, team integration, and retention. The smooth transition to becoming an acute care nurse ensures that the NHN is successful in learning their new role identity and responsibilities. The inability to ensure this among NHN can result to staff attrition, incremental on-boarding cost, staff shortages, and low morale of existing senior staff. In 2016, the Juravinski Medicine Program, which has 90-bed capacity, supports NHNs through standardized 5.5-day corporate orientation followed by a 4 to 7 days of clinical preceptorship. The corporate orientation provides general information required to care across different settings in the hospital. Meanwhile, the preceptorship exposes the NHN to the specific clinical practice settings. However, based on feedback from NHNs and their mentors, the current process is lacking in providing knowledge with unit-specific processes and procedures. Methods: A quality improvement approach was undertaken in the restructuring of the current on-boarding process that will better support NHN. The Meleis’ Transitions Theory (1975) was used as the theoretical model of this work.A working group consisting of management and frontline staff redesigned the current on-boarding process to include (a) 4-hour medicine-specific workshop, (b) protocol for determining number of clinical preceptorship days, (c) visual pathway and toolkit, (d) 7 independent consolidation shifts with assigned nurse, and (e) standardized manager and educator touchpoint meetings. Results: A total of 62 NHN (31 pre-implementation and 31 post-implementation) were included in the evaluationof this project. Staff self-reported efficacy on medicine unit-specific processes increased from 44% to 82%. Their selfreported preparedness improved from 66% to 80%. The 6-month retention also went up from 56% to 81%. Conclusion: This project represents the importance of regularly analyzing the on-boarding process so that it aligns with the learning needs of NHNs. It also proves that a smooth transition of NHNs in their new practice environment can promote patient safety through increased efficacy and financial gain through increased staff retention.

Ask about this article

Answers come only from this article's title, abstract and keywords, each sentence pointing to where it comes from. Your question is sent to OpenAI to write the answer. Scholars Central does not store it.

Try:

Similar by topic

Follow

New articles from what you follow go into your email digest, once you agree to alert emails.

  • SubjectNursing & Healthcare
  • BylineArticles whose byline prints “Nick Anthony Millar”
  • BylineArticles whose byline prints “Mena Billeci”
  • BylineArticles whose byline prints “Mark Coupland”
  • BylineArticles whose byline prints “Stuart Paavola”